Barpa 12022 John Gorton Campus Carpark - JGCC
近期公告
  • 19th 十一月 2024, JGCC- Energisation of the Site & Building Structure

    All distribution boards throughout the levels of the carpark will become energised (and all services feed throughout the building). All workers are advised there will be live power on site and that all electrical systems, cabling, risers, underground conduits etc. should be considered as live from today forward. Any excavation within the building envelope, significant slab drilling, works in risers near DB and trays, MSB and comms room works etc. should be assessed for the likely impact and proximity to live cables with cast in conduits via the appropriate risk management procedures. If you require access to service areas or plan to undertake any works near services, please contact the team to ensure it is safe to do so

现场天气预报
当前现场天气

天气不可用


观测信息来自 - Bureau of Meteorology
观测位置 - Canberra、NEW SOUTH WALES
时区 - 澳大利亚东部标准时间
预测 - 星期日、5 四月

Partly cloudy.
最低: 9C 最大: 23C
可能有雨。: 20%


预测信息来自 - Bureau of Meteorology
预测位置 - Canberra、NEW SOUTH WALES
时区 - 澳大利亚东部标准时间
明天 - 星期一, 6 四月

Partly cloudy.
最低: 9C 最大: 26C
可能有雨。: 30%
预计降雨: 0 至 1mm


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册